One of the first questions I receive when we start talking about a renovation concerns the timing: “How long in advance do we have to move?“. The most honest answer is that the best time to involve the professional is well before you have a work start date set on the calendar.
The 2-3 month rule
Generally speaking, the ideal is to move two or three months before the date you want to start the work. It is not an empty bureaucratic time: it is the margin necessary to transform an idea into a solid project, without hasty choices.
In those weeks several things happen, each with its own weight:
- analysis and initial proposals: the studio surveys the spaces, studies the technical critical issues and develops the first distribution and aesthetic solutions.
- discussion and revisions: the project is shared, discussed and refined based on your observations.
- the estimation process and optimization: once the direction has been defined, quotes are requested from the companies. It is almost inevitable that, faced with the real costs and supply times of the materials, the project undergoes some further adjustments to find the right balance between desires and budget.
- building permit applications: only when everything is really defined is the qualification deposited with the Municipality to be able to open the construction site in order.
Is it possible to compress times?
Technically, yes, it is possible to condense the phases, but there is an aspect that is often underestimated: your decision-making time.
Renovating means choosing how you will live every day. It requires looking at a plan, imagining daily gestures, discussing things as a family and taking a few days to metabolize a proposal before giving feedback. In practice, it is almost always the clients themselves who need a bit of breathing space between one meeting and another – and rightly so. Having the right margin allows you to truly participate in the project, instead of being subjected to the urgency of deadlines.
Even earlier: during the buying and selling process
There is another moment, often even more strategic, in which to involve an architect: before signing the purchase deed or conveyance deed.
Making use of technical support at this stage allows you to read the urban planning and cadastral documentation provided by the seller with a critical eye. Identifying any discrepancies in time puts you in a position to ask the current owner to regularize the situation at their own expense before the deed, avoiding inheriting constraints, unexpected costs and delays just when you would like to start planning.
The notary, in fact, does not carry out technical checks on site: in the deed, he reports the history of the building practices and records the declaration of conformity with the Land Registry – which however only has fiscal value. To exclude the presence of irregularities, an architectural survey and a cross-check with the projects filed with the Municipality are needed.
Conclusions
These are the guidelines valid for most cases, but obviously each project is different and may have different timing. Surely, the sooner we start thinking together, the more peacefully we will arrive at the first day of construction.
If you are considering a purchase or are already thinking of renovating in the next few months, you can write to me telling me where you are at and what your timing is.